100字范文,内容丰富有趣,生活中的好帮手!
100字范文 > 顶推法施工 incremental launching construction英语短句 例句大全

顶推法施工 incremental launching construction英语短句 例句大全

时间:2020-02-12 12:47:54

相关推荐

顶推法施工 incremental launching construction英语短句 例句大全

顶推法施工,incremental launching construction

1)incremental launching construction顶推法施工

英文短句/例句

1.The Research on Construction Control in the Incremental Launching of Main Girder of Cable-stayed Bridge with Steel Box Girder钢箱梁斜拉桥主梁顶推法施工阶段控制研究

2.The transverse No.1 Bridge of Japan is a bridge on slope and in curve with small radius and was installed by segmentally launching.日本横向一号桥是一座采用顶推法施工的小半径弯坡桥。

3.Research on Incremental Launching Method of Steel Truss Cross-structure in Luyintang Gully陆阴塘冲沟钢桁架跨越结构顶推法施工技术研究

4.Study on the Jacking Force Induced by Linear and Curved Pipe Jacking Construction;直线及曲线顶管施工中的顶推力研究

5.The Research of Key Problems in the Incremental Launching of Cable-stayed Bridge with Steel Box Girder;钢箱梁斜拉桥顶推施工关键问题研究

6.On Multipoints Jacking Construction of Zhujiang Bridge with 5 × 50 m Continuous Box Girder珠江大桥5×50m连续箱梁多点顶推施工

7.Construction Method and Technology Measure for Pipe Tacking in A Certain Power Plant in Nansha南沙某电厂顶管施工方法及技术措施

8.The Research of the Launching Construction Control Technology about the Concrete Skewed Continuous Beam Bridge;混凝土斜连续梁桥顶推施工控制技术研究

9.Simulation and Optimization for Long-span Changing Curvature Vertical Curve Steel-box Girder Bridge Constructed by Incremental Launching Method大跨度变曲率竖曲线钢箱梁顶推施工仿真优化

10.Incremental Launching Technology of Steel Box Girder in Ji"nan Huanghe Bridge of Qingdao-Yinchuan Highway青银高速济南黄河大桥钢箱梁顶推施工技术

11.Incremental launching construction research of the closure section of Xicheng bridge at Nanping in Fujian福建省南平市西城大桥合龙段顶推施工研究

12.Calculation Analysis of Closure Jacking Force and Introduction to Construction Monitoring Scheme of Incremental Launching of Continuous Rigid Frame Bridge连续刚构桥顶推合拢的计算分析及施工监控

13.Calculation and Application of Lunching Force in Bridge Construction by Swing桥梁转体施工过程中顶推力的计算及应用

14.DOUBLE JACK CONSTRUCTION METHOD APPLIED TO CHIMNEY SLIP-FORM双千斤顶施工法在烟囱滑模中的应用

15.Pneumatic Jacking Inverted Construction for 240 m Stack Inner Steel Cylinder240m烟囱钢内筒气压顶升倒装施工法

16.Selection of Pipe Jacking Methods for Typical Stratum in Beijing Region北京地区典型地层顶管施工方法选择

17.Construction Technology of Changing Bridge Rubber Abutment by Integral Jacking整体顶升更换桥梁橡胶支座的施工方法和措施

18.Survey Method for Pipe-pushing Construction in Dahuofang Reservoir Water Delivery Project大伙房水库输水工程顶管施工测量方法

相关短句/例句

Propulsion construction method顶推施工法

3)construction by multipoint incremental launching method多点顶推法施工

4)incremental launching construction顶推施工

bined with practical engineering of west bridge in Zhujiang bridge,the author separately illustrates the construction technology and time-limit of traditional bearing changing method and improved bearing as sideway,compares the two bearings,and introduces the selection of new-type bearing,in order to accumulate experience for bridgeincremental launching construction.结合珠江大桥西桥工程实例,分别阐述了传统的更换支座方法的施工工艺及工期和改进支座兼作滑道的施工工艺及工期,并对其进行了比较,最后介绍了新型支座的选型,为桥梁顶推施工积累了经验。

2.The reasonable arrangement of the launching nose will be critical to the smooth proceeding ofincremental launching construction of the whole bridge.导梁的长度、刚度及重量在顶推施工阶段对顶推主梁的内力有着重要的影响,其合理配置是全桥顺利顶推的关键。

3.The main shipping channel bridge and the non-navigable span approach bridges of the Bridge respectively make use of the long span continuous composite arch bridges and continuous composite box girder bridges that are all erected by the multi-point and synchroincremental launching construction technique.其中,引桥顶推施工时,85 m跨间无临时墩;主桥顶推施工时,210 m跨间仅设置1座临时墩。

5)incremental launching顶推施工

1.A description is given about theincremental launching technology used in the 96-meter double-track simply-supported trussed girder passing over the second ring road of Beijing.介绍了京津城际轨道交通工程改京山线96 m双线简支钢桁架梁跨越北京市二环路顶推施工技术,该桥施工时因地制宜,充分利用二环路的辅路空间以尽量减小顶推跨度,上滑道采取间断式布置,下滑道采用不连续多段长滑道,用八三式军用墩器材搭设临时墩,并在主梁前方加设长导梁,顺利完成了钢桁梁顶推架设。

2.Incremental launching method is popular in long span skew continuous beam bridges which are across canyons because constructing of freeways in the mountains of western China are limited by land feathers 、geological conditions and highway alignment .0 有机结合,编制了“斜梁桥顶推施工仿真计算分析”程序。

3.The construction methods of steel box girder in Ji\"nan Huanghe cable-stayed bridge of Qingdao-Yinchuan Highway breaks the traditionalincremental launching technology.青银高速济南黄河大桥斜拉桥钢箱梁施工方法突破了传统的顶推施工工艺,采用在每一个临时墩上设置棘块式顶推设备的方法,实现了由简单的拖拉式顶推到真正意义上的顶推施工方法的转变。

6)incremental lounching顶推施工

1.In box culvertincremental lounching construction,precipitation and covering water are often carried on contemporarily so as to ensure the box culvert and its bottom be avoided the effect of water,and ensure the construction to go on wheels.在箱涵顶推施工中,为保证箱涵及涵底免受地下水的影响,需要同时进行降水和封水措施,以确保施工的顺利进行。

2.This paper introduces the application of MATLAB to programming for continuous girder bridge byincremental lounching, particularly for analyzing the course internal force dynamic analysis.文章介绍了MATLAB语言在顶推施工预应力混凝土连续梁桥施工过程内力动态分析程序设计中的应用 ,从而说明基于MATLAB语言开发结构分析软件的可行性与优越性。

延伸阅读

顶管施工顶管施工黝 顶管施工

本内容不代表本网观点和政治立场,如有侵犯你的权益请联系我们处理。
网友评论
网友评论仅供其表达个人看法,并不表明网站立场。