100字范文,内容丰富有趣,生活中的好帮手!
100字范文 > 降低造价 cost reduction英语短句 例句大全

降低造价 cost reduction英语短句 例句大全

时间:2019-02-27 08:53:22

相关推荐

降低造价 cost reduction英语短句 例句大全

降低造价,cost reduction

1)cost reduction降低造价

英文短句/例句

1.The car"s designers have sacrificed comfort to economy .汽车设计人员为降低造价而舍弃了舒适。

2.The car" s designers have sacrificed comfort to economy, ie have made the car less comfortable in order to sell it at a low price.汽车设计人员为降低造价舍弃了汽车舒适方面的一些设想.

3.Ways of project cost analyze and reduce project cost;工程造价分析与降低工程造价的途径

4.On the Causes of the Cost Growth in Expressway Construction and Measures to Reduce Project Costs;论高速公路造价增长原因及降低工程造价措施

5.To lessen the price or value of.降低降低价格或价值

6.But prices of agricultural commodities are low because of overproduction.但农产品生产过剩会造成其价格降低。

7.The Way for Controlling the Engineering and Field Construction Cost论控制工程造价、降低油田建设成本

8.The Measures for Reducing the Project Cost in the Rural Highway Construction;农村公路建设中降低工程造价的措施

9.The argument of strengthening the capital construction before the event to lower the price of the engingeering builds;加强基建事前管理降低工程造价刍议

10.On the exploration of the project cost reduction in the highway design高速公路设计中降低工程造价的探讨

11.The manufactory is planning to put down the cost prices of these articles.制造厂正在设法降低这些产品的成本价格。

12.decrease in value of an asset due to obsolescence or use.由于过时或使用而造成的财产价值的降低。

13.Exploration of measures to cut engineering cost of urban mass transit projects;城市轨道交通项目降低工程造价措施的探讨

14.Promote the Rock-Soil Engineering System, Reduce the Cost of Engineering and Reconnaissance;推行岩土工程体制,降低工程造价与勘探成本

15.How to reduce the engineering cost of construction projects in construction phase;如何降低建设项目施工阶段的工程造价

16.Study on measures for engineering cost cut of bridge design of urban LRT;城市轻轨桥梁设计降低工程造价措施研究

17.Strengthen design and consturction managementto reduce project cost logical;加强设计和施工管理合理降低工程造价

18.To reduce in rank, value, or price.贬低、降价减低级别、贬低价值或价格

相关短句/例句

reduce cost降低造价

3)reducing the construction cost降低工程造价

4)reduce cost of boiler降低锅炉造价

5)HOW TO REDUCE THE COST OF PROJECT如何降低工程造价

6)electricity price reduction降低电价

延伸阅读

发电工程造价发电工程造价power project construction costfadion gongeheng zoojlo发电工程造价(power projeet constructioncost)指发电工程从前期工作开始,到投产发电的全部工程费用。它因内容不同可分为发电工程静态投资、发电工程动态投资。发电工程静态投资由建筑工程费、设备购!费、安装工程费、其他费用、基本预备费和材料价差组成,其反映的是某一价格水平年的静态造价水平。1998年价格水平中国内发电工程单位造价水平为:2x300MW国产引进型机组新建4422元/kW,扩建3759元/kw,4台机组时4090元/kw;2X600MW国产引进型嫌煤机组新建3675元/kW,扩建3381元/kw,4台机组时3528元/kw;2 x 300 MW等级进口嫩煤机组新建5010元/kw,扩建4460元/kw,4台机组时4735元/kW;2x600MW等级进口燃煤机组新建4640元/kw,扩建4450元/kW,4台机组时4545元/kW。发电工程动态投资由发电工程静态投资、价差预备费和建设期贷款利息组成,其中价差预备费是指工程从编制年至竣工年期间建筑工程费、设备购置费、安装工程费、其他费用上涨而预备的费用;建设期贷款利息是指工程项目的各类融资在建设期发生的利息。按电力工程单机竣工结算办法,第一台机组及公用系统所发生利息计算到第一台机组投产前一季度,第二台机组投资所发生的利息计算到第二台机组投产,以下类推。1”8年审批的发电工程初步设计概算动态投资情况如下:2台30万新建国产机组为4997元/kW,2台60万扩建国产机组为4481元/kW,2台35万新建进口机组为5588元/kW,2台“万新建进口机组为6388元/kW。由于价差预备费、建设期贷款利息与国民经济发展情况、物价上涨情况、利息变化情况有关,而这些因素往往具有不可预见性,因此从1995年起对工程概算执行“静态控制,动态管理”的政策,即控制静态投资在批准的额度以内,动态投资则可根据实际情况进行调整。

本内容不代表本网观点和政治立场,如有侵犯你的权益请联系我们处理。
网友评论
网友评论仅供其表达个人看法,并不表明网站立场。