100字范文,内容丰富有趣,生活中的好帮手!
100字范文 > 施工阶段风险 constructing risk英语短句 例句大全

施工阶段风险 constructing risk英语短句 例句大全

时间:2023-12-27 00:28:29

相关推荐

施工阶段风险 constructing risk英语短句 例句大全

施工阶段风险,constructing risk

1)constructing risk施工阶段风险

英文短句/例句

1.The Risk Management of the Diesel Oil Hydrogenation Project under Construction;柴油加氢项目建设施工阶段风险管理研究

2.Risk Assessment and Risk Management for Cantilever Cast Pre-stresed Concrete Continuous Bridge during Construction Stage;悬臂浇筑预应力混凝土连续梁施工阶段风险评估和风险管理

3.The Risk Control and Management Research of Metallurgy Projects;大型冶金工程项目施工阶段风险控制与管理研究

4.The risk prevention measures in engineering bidding and construction period;工程投标及施工阶段的风险防范措施

5.Discussion of Risk Countermeasures in Bid Stage of Foreign Projects谈国外工程投标阶段的风险防范措施

6.The Study on Contractor Risk Management of Road Engineering Project at Construction Stage;公路工程项目施工阶段承包商风险管理研究

7.The Risking Research of Contractors in Engineering Construction Bidding Stage;工程施工招投标阶段承包商的风险研究

8.Risk Analysis and Management During the Bidding Phase of Electric Power Projects;电力工程施工招投标阶段的风险分析和管理

9.The investment risk grey association identification model in construction phases of projects;工程项目施工阶段投资风险灰色关联辩识模型

10.The research on the risk management method of cost control in the phase of construction;工程施工阶段成本控制风险管理方法研究

11.An Identification Model with Hierarchy Analysis for Investment Risks in the Phase of Project Construction;工程项目施工阶段投资风险层次分析辨识模型

12.Study on Investment Control and Investment Venture in the Implement Period of the Construction Project;施工阶段投资风险分析及投资控制研究

13.Quality Control Risks of Construction Agent Project on Carrying Out;代建制项目施工阶段质量控制风险研究

14.Analysis and Countermeasures of Cost Management Risk in Bid Phase of Construction Enterprises;施工企业招投标阶段造价管理风险分析与对策

15.Bidding Stage the Risk Analysis and Prevention of Construction Enterprises;招投标阶段施工企业的风险分析与防范

16.Crisis management analysis on the implement stage of railway construction project铁路工程建设项目实施阶段风险管理分析

17.Management Risk Analysis for Construction Enterprises in Tender Stage and Countermeasures施工企业投标阶段管理风险分析与对策

18.Constructing Risk Evaluation with Triangular Fuzzy Number基于三角模糊数的工程项目施工阶段的风险评价

相关短句/例句

construction stage施工阶段

1.How to do well the supervision work in the engineeringconstruction stage;浅析如何做好工程施工阶段的监理工作

2.Engineering cost control in theconstruction stage of the construction project;建设项目施工阶段工程造价控制

3.Discussion on the project cost control inconstruction stage;浅谈施工阶段项目的成本控制

3)construction phase施工阶段

1.Reorganizing method of engineering supervision data inconstruction phase;谈施工阶段工程监理资料的整编方法

2.Analysis on effective cost control measures in design andconstruction phases;浅析设计和施工阶段造价的有效控制

3.Study on announcement system atconstruction phase;浅议工程施工阶段的公示制度

4)constructing stage施工阶段

1.Research on the cost management ofconstructing stage in construction project;浅谈项目施工阶段的造价控制

2.Discussion on cost management ofconstructing stage in construction project;谈建筑工程施工阶段的造价管理

3.Cost control ofconstructing stage during construction items executing process;浅谈建设项目实施过程中施工阶段造价控制

5)construction period施工阶段

1.Supervision on investment control inconstruction period of Xiaowan hydropower project小湾水电站施工阶段监理投资控制工作

2.Stress monitoring analysis in theconstruction period of the continuous beam bridge cantilever连续梁桥悬臂施工阶段的应力监测分析

3.The top emphasis of the project cost control should be placed on internal management, especially on the effective control of the direct cost andconstruction period.工程成本控制主要是放在内部管理上,特别是直接工程费和工期的有效控制,其次外部的市场因素和施工阶段的变更索赔也是着重考虑的一个方面。

6)construction[英][k?n"str?k?n][美][k?n"str?k??n]施工阶段

1.Based on the experience of gravity type hathpace stracture cracks prevention and care, the paper summaries the way that check calculation ofconstruction defects, discusses the prevention and care method of cracks, The results of this paper have guilding value for similar projects.本文结合重力式高台结构开裂病害防治的施工实践,总结了通过结构常规的施工阶段验算来发现结构薄弱点的方法,并论述了解决重力式高台在施工过程中开裂的病害防治方法。

2.Its structural response such as displacement and stress in beam and pylon, tension in cable on the bridge under dead loads, vehicle load and temperature action during itsconstruction and service stages has been measured.以武汉市江汉四桥(主跨232m的独塔双索面预应力混凝土斜拉桥)为例,对混凝土斜拉桥在施工阶段和使用阶段由荷载及温度作用所导致的结构反应进行了现场检测,对结构中的几何非线性影响进行了比较详尽的分析。

3.According to the experiences ofconstruction management,this article introduces the basis?flow chart and measures of water conservancy engineeringconstruction expenses monitoring.水利是国民经济的命脉 ,本文结合作者在施工现场管理工作的体会和经验 ,提出了水利工程施工阶段造价控制的依据、控制流程图和应采取的一些措施 ,并通过实例对其进行了详尽的论述 ,对工程造价管理人员有一定的借鉴作

延伸阅读

施工施工constructionshlgong施工(eonstruetion)核电厂建设过程中在工程现场所进行的包括前期工程、土建施工和设备安装在内的全部活动。分施工准备、组织施工和竣工验收三个阶段.核电厂的建设坚持“安全第一,质量第一”的方针,并依据相关的大纲、程序进行管理。施工准备是保证工程项目具备开工和连续施工的基本条件‘组织施工是工程实施最重要的部分,必须认真做好质量、进度、投资三大控制和安全管理;竣工验收是检查验证完工的建筑物、构筑物及就位的设备、系统的质量、功能符合设计要求,竣工资料真实、完整。核电厂施工要严格按规章制度进行,做到凡事有章可循,凡事有据可查,凡事有人负责,凡事有人监怪。施工准奋施工准备分为施工组织准备、施工技术准备、施工物资准备及施工现场准备.施工组织准备工作涉及工程建设的三方,即业主、施工承包单位及监理单位,内容主要包括建立健全组织机构及进行工程管理规划设想.业主的施工管理机构为:施工经理领导下设土建施工、设备安装(核岛、常规岛及电厂辅助设施、电气)、施工支持(文件、测t、设备控制、金属质量、安全)等职能处室,由施工经理统一对外,要求人员精干,职贵明确,建立管理程序,严格按合同和程序办事,高效规范运作。施工单位应按合同规定建立施工组织机构,管理机构要高效精干,建立并实行一级质t保证、两级〔队(厂)与公司级〕质量控制制度,施工机构要与承担的任务相适应.建立、分析人力动员曲线,编写、出版管理程序和工作程序,开展管理及技能培训、工艺评定等。监理单位根据监理委托合同.建立项目监理部,总监理工程师及专业监理工程师应具备核电工程施工管理经验。施工技术准备主要包括图纸文件及施工组织设计。业主应按合同规定及时将图纸文件交付施工单位,并确认可以使用。施工单位应认真阅读、理解,如有疑问之处,及时向业主提出澄清,由业主或设计单位做出答复。由承包单位编制并经业主(或委托监理单位)审查的施工组织设计是指导现场施工全过程的重要技术文件,其重点是施工方案、进度计划、人员及机具配备、施工平面布置及质量与安全措施.为此,应据此对现场进行统筹规划,科学组织,建立正常合理的施工程序,充分利用空间,争取时间,采用已经成熟的先进施工技术,并进行不利气候因素等风险分析.适当留有余度,以应付施工过程中的某些突发事件。对混凝土人模温度控制、大体积混凝土裂缝控制、反应堆弯顶整体吊装等重要施工方案进行专题分析、论证。施工物资准备主要包括建筑安装材料、施工机具、永久设备三个方面。对开工必备的材料、机具要安排先期进场。

本内容不代表本网观点和政治立场,如有侵犯你的权益请联系我们处理。
网友评论
网友评论仅供其表达个人看法,并不表明网站立场。