100字范文,内容丰富有趣,生活中的好帮手!
100字范文 > 隔离煤柱 partition coal pillars英语短句 例句大全

隔离煤柱 partition coal pillars英语短句 例句大全

时间:2020-01-14 01:34:38

相关推荐

隔离煤柱 partition coal pillars英语短句 例句大全

隔离煤柱,partition coal pillars

1)partition coal pillars隔离煤柱

1.Dividingpartition coal pillars and region coal pillars, and selecting parameter are key to prevent disaster.区分隔离煤柱和区内煤柱,选择合理开采参数,是防止灾变的关键。

英文短句/例句

1.Second Mining under Isolated Pillar Left by Wedge-pillar Mining Method刀柱复采跨隔离煤柱布置探索与实践

2.Research on Longwall Rigid Separating Pillar Mining Technology of Small Colliery in YSF Field;榆神府矿区小煤矿长壁布置刚性隔离煤柱房柱式开采研究

3.cage,for ball, roller or needle roller bearing滚珠、滚柱或滚针轴承隔离圈

4.Numerical Modeling on Fluid-Solid Coupling for the Waterproof Coal Pillar Design流-固耦合作用下防隔水煤柱留设的数值模拟

5.Strike Coal Pillar Affected to Strata Pressure of Fully Mechanized Longwall Mining Face with High Cutting Height in Closed Distance Seam走向煤柱对近距离煤层大采高综采面矿压影响

6.Isolation of plane SV waves by discontinuous barriers composed of several rows of cylindrical cavities多排柱腔构成的非连续屏障对SV波的隔离

7.Stability Analysis on-693m Level Insulating Pillar of Deep Excavation of Chambishi Copper Mine谦比希深部开拓-693m水平隔离矿柱的稳定性分析

8.go into [come out of] quarantine被隔离 [解除隔离]

9.Research on Application of Safety Isolation and Coal Mine Multi-Service Access;基于安全隔离的煤矿多业务接入应用研究

10.A research on coal pillar stability in the upper Wangeviry gob area in contiguous coal seams近距离煤层采动上部旺采区煤柱稳定性实测研究

11.Separate the lower A-pillar cowl trim from the A-pillar lower cowl.从A-柱下部前隔板上拆下下部A-柱前隔板。

12.Study on Longwall Mining Pressure and Control Beneath the Area Mined with Longwall-Pillar Method in Ultra-Close Multiple-Seams;极近距离煤层刀柱采空区下长壁开采矿山压力及其控制研究

13.Analysis on Ground Subsidence Control Mining Plan with Grouting in Overburden Separated Strata above Coal Pillar Under Railway Line in Tangshan Mine唐山矿铁路煤柱覆岩离层注浆减沉开采方案分析

14.To separate or keep apart.隔开隔开或保持距离

15.open hole single packer test string裸眼单封隔器测试管柱

16.an interval of five metres between columns柱子间的间隔是五米

17.inflatable packer test string胶囊封隔器测试管柱

18.having a series of columns arranged at regular intervals.拥有一连串的每隔一定间隔的圆柱。

相关短句/例句

wells sector coal pillar isolation井界隔离煤柱

3)water barrier隔水煤柱

1.Research on critical size ofwater barrier in underground coal mine;论井下隔水煤柱承压破坏的临界尺寸

4)isolate pillar隔离矿柱

1.,assume that the mined-out area hazard could be controlled withisolate pillar restraint the circular damage of the collapse was,according to the RFPA simulating,the effect is clear evidence,then the importance that filling body with broader and lower strength substituted forisolate pillar in mined-out area hazard controlling was discussed.利用RFPA模拟软件分析房间矿柱在大范围岩层移动和应力集中控制作用的基础上,提出了应用隔离矿柱控制采空区连锁式破坏的设想,并进行了数值模拟;在此基础上以较低强度条带充填体代替隔离矿柱,同样有较好的效果。

5)Separation pillar隔离柱

6)isolated soil column隔离土柱

延伸阅读

单柱式隔离开关单柱式隔离开关single post type disconnecting switchdonZhush一gel一kolguon单柱式隔离开关(single卿t type disconnec-ting switch)只有一个绝缘支柱的隔离开关。由绝缘支柱、折亚活动臂(动触头)和静触头三部分组成,如图所示。按折叠活动臂结构的不同可分为剪刀式和半剪刀式两种型式·析登活动.几今钱烤二绝缘支柱用来支持和操作上部导电杆和折叠活动臂。通常由两个支柱绝缘子组成,一个是固定的大直径、高强度支柱绝缘子,起支持导电\绝缘支柱单柱式隔离开关 部分的作用;另一个是活动的小直径、普通强度的支柱 绝缘子,能水平旋转,用以操作活动有,完成断开和闭 合的动作。 折登活动肴隔离开关的导电部分,又称动触头。 它安装在绝缘支柱的上部,沿垂直方向起落,以完成断 开和闭合的动作。活动臂有两种结构:①单侧折且活动 臂,非对称结构,简称半剪刀式.②双侧折亚活动价,对称结构,简称剪刀式。 折登活动钾是隔离开关 的核心部件,应满足载流 量的要求,并具有规定的 动、热稳定性,一般用铝 合金管或铜管制成。由于 单柱式隔离开关的静触 头安装在母线上,具有一 定的风偏摇摆,故要求折 益活动臂具有足够的长 度,使隔离开关在风偏时 能可靠的夹住静触头。涣位箱静触头隔离开关卜地引出线;5一换位排的不操作的导电部分,通常安软在隔离开关上方的母线上.由于结构不同,半剪式隋离开关的静触头垂直母线安装,剪刀式隔离开关的静触头平行母线安装。单柱式隔离开关的应用具有以下特点:①它是垂!开启的方式,通常用作母线隔离开关,可以直接布t在母线下方,减少高压比电装1的纵向尺寸,节省占地。②它的折登活动仲结构比较复杂,隔离开关的价格较贵,通常只在电压等级较高的配电装t中采用,在我国巳形成220~SOokV单柱式隔离开关的系列产品.③剪刀式隔离开关钳夹范围大,与有一定风偏摇摆的软母线配合有利,而半剪刀式隔离开关钳夹范围小,与固定不动的硬母线(支持式)配合有利.

本内容不代表本网观点和政治立场,如有侵犯你的权益请联系我们处理。
网友评论
网友评论仅供其表达个人看法,并不表明网站立场。