100字范文,内容丰富有趣,生活中的好帮手!
100字范文 > 枢纽布置方案 layout of Water Conservancy Project英语短句 例句大全

枢纽布置方案 layout of Water Conservancy Project英语短句 例句大全

时间:2022-02-22 10:47:49

相关推荐

枢纽布置方案 layout of Water Conservancy Project英语短句 例句大全

枢纽布置方案,layout of Water Conservancy Project

1)layout of Water Conservancy Project枢纽布置方案

2)hub plan枢纽方案

bined with the importance ofhub plans,it discusses the plans research after Changchun hub s manipulation in Ha-Da passenger line,generalizes and compares these plans,concludes a rational constructing plan,which can be reference and researching use for passenger linehub plans.结合枢纽方案的重要性,探讨了哈大铁路客运专线引入长春地区后,长春枢纽方案的研究,并对方案进行了概述、比选,得出了比较合理的施工方案,可供客运专线枢纽方案研究参考。

英文短句/例句

1.A Scheme Comparison Method of Dedicated Passenger Line Join into Terminal Based on Fuzzy Multi-objective Decision Making客运专线引入枢纽方案的多目标决策方法

2.Application of value engineering in determining the scheme of Wenzhou railway terminal价值工程在温州铁路枢纽方案决策中的应用

3.Studies on Engineering Geological Conditions of the Xiangshui Reservoir and Choices of Hinge Schemes;响水水库工程地质研究及枢纽方案比选

4.TALK ABOUT DESIGN SCHEME TO LEAD JING HU HIGHSPEED RAILWAY INTO TIANJIN TERMINAL COMBINED WITH RAILWAY PLANNING IN JING JIN QIN REGION结合京津秦地区谈京沪高速铁路引入天津枢纽方案

parative Research for Prepared Schemes of International Container Pivotal Port of Shanghai;上海国际集装箱枢纽港备选方案比较

6.Discussion on Optimization of Reconstruction Plan for K440 Substation in Huaihua Railway Terminals浅谈怀化枢纽K440所改造施工方案优化

7.Research of Disposal Project on the Complex Groundsill Foundation about Zhuzhou Navigation and Electricity Junction;株洲航电枢纽复杂地基基础处理方案研究

8.Construction Diversion Scheme and Countermeasure of Sihugou Hydro-Junction Project;四湖沟水利枢纽工程施工导流方案与对策

9.A Study on the project of Three Gorges Cascade Reservoir Dispatching Automatization System;三峡枢纽梯级水库调度自动化系统方案研究

10.Scheme Choice for Introducing Passenger Dedicated Line into Railway Hub;铁路客运专线引入既有枢纽的方案选择

11.Alternatives for Longkeng Pivot Interchange and New Idea in Design龙坑枢纽互通方案的比选与设计新理念

12.Primary Selection of Location and Number for High-speed Passenger Stations in Railway Hub枢纽高速客运站位置及数量方案的初选

13.Option optimization of construction control network in structure area and application effects analysis枢纽区施工控制网的方案优化与应用效果分析

14.Downstream water level harnessing scheme for Shuikou Hydropower Station福建闽江水口枢纽坝下水位治理工程方案研究

15.Numerical simulation on navigation condition in open diversion channel of Yingpan Hydro-junction Project in Wujiang River乌江银盘航电枢纽明渠通航方案数值模拟

16.Ideas on Soil and Water Conservation Plan of Tingzikou Water Control Project亭子口水利枢纽水土保持方案编制思路

17.General Layout Design for Bajiangkou Hydropower Station in the Guijiang River of Guangxi广西桂江巴江口水电站枢纽总体布置方案设计

parison and Selection for Schemes on Shenyang-Dandong Passenger Dedicated Line Inducting into Shenyang Hub沈丹客运专线沈阳枢纽引入方案的比选

相关短句/例句

hub plan枢纽方案

bined with the importance ofhub plans,it discusses the plans research after Changchun hub s manipulation in Ha-Da passenger line,generalizes and compares these plans,concludes a rational constructing plan,which can be reference and researching use for passenger linehub plans.结合枢纽方案的重要性,探讨了哈大铁路客运专线引入长春地区后,长春枢纽方案的研究,并对方案进行了概述、比选,得出了比较合理的施工方案,可供客运专线枢纽方案研究参考。

3)complex layout枢纽布置

1.Design character ofcomplex layout in Yongqing equalizing reservoir;永庆反调节水库枢纽布置设计特点

2.On the basis of the original design,taking into consideration the actuality of the upstream constructed or constructing power stations,the author introduced the major optimized contents for thecomplex layout design.介绍了广西桂江下福水利枢纽工程的布置设计,在原设计基础上,根据上下游已建和在建电站的实际情况,较为系统地介绍了该水利工程枢纽布置及优化设计的主要情况。

3.The comparison for thecomplex layout scheme of yuelong electrical drainage station extension project illustrates the comparison for that has brought about the active influence to lower the cost of the general project and improve the benefit of.通过对肇庆市跃龙电排扩建工程枢纽布置方案的对比,说明工程枢纽布置方案的比较对整个工程造价的降低以及效益的提高会产生积极的影响。

4)layout[英]["le?a?t][美]["le"aut]枢纽布置

1.Onlayout of pumped storage station;抽水蓄能电站枢纽布置的探讨

2.Research onlayout of Wudongde Hydropower Station乌东德水电站枢纽布置方案研究

3.It is recommended that the rockfill dam with an inclined clay core wall will be adopted for thelayout of one-stage development of Daliushu project, and the concrete face rock-fill dam is regarded as an alternative scheme.黑山峡河段两个开发方式的勘测设计工作进行了50多年,一级开发大柳树高坝枢纽布置设计以土质斜心墙堆石坝为推荐方案,混凝土面板堆石坝为备用方案。

5)project layout枢纽布置

1.Systematically introduced the research process of the layout scheme of Shuibuya hydroproject and the lastproject layout scheme.系统地介绍了水布垭水利枢纽的布置方案研究过程与最终的枢纽布置方案。

2.Since then,its main technical problems onproject layout,dam type,release structure,axis of main powerhouse,configuration of tailrace tunnel,type of navigation structure have been studied for several schemes in accordance with the topographical,geological conditions and hydrological characteristics at the dam site.彭水水电站的勘测设计与科研工作始于上世纪70年代初,30多年来,针对坝址地形、地质条件及水文特性,对枢纽布置、坝型及泄水建筑物、电站主厂房轴线、尾水洞体型和通航建筑物型式等主要技术问题开展了多方案研究,确定了长溪坝址及河床泄洪、右岸地下厂房、左岸通航建筑物的枢纽布置格局,以及大坝采用碾压混凝土弧形重力坝、主厂房采用与岩层走向呈0°角布置、电站尾水采用变顶高隧洞、通航建筑物采用船闸加升船机的建筑物型式方案。

6)general layout枢纽布置

1.Discussion on the problems ofgeneral layout, flood discharge and energy dissipation for high arch dam;高拱坝的枢纽布置与泄洪消能

2.Study ongeneral layout of Nuozhadu Hydropower Station;糯扎渡水电站枢纽布置研究

3.Study on thegeneral layout and key technical issues of Longtan Hydropower Project;龙滩水电站枢纽布置及重大问题研究

延伸阅读

长江三峡水利枢纽鸟瞰图长江三峡水利枢纽鸟瞰图长江三峡水利枢纽鸟瞰图《中国建设企业百强榜》

本内容不代表本网观点和政治立场,如有侵犯你的权益请联系我们处理。
网友评论
网友评论仅供其表达个人看法,并不表明网站立场。