100字范文,内容丰富有趣,生活中的好帮手!
100字范文 > 路基土石方 subgrade earthwork英语短句 例句大全

路基土石方 subgrade earthwork英语短句 例句大全

时间:2021-03-01 01:03:16

相关推荐

路基土石方 subgrade earthwork英语短句 例句大全

路基土石方,subgrade earthwork

1)subgrade earthwork路基土石方

1.Brief talk on the influence ofsubgrade earthwork construction method on project cost浅谈路基土石方施工方法对工程造价的影响

2.Therefore,the result of the totalsubgrade earthwork volume evaluation using cross sections at these selected locations is accurate.介绍了一种自动选择地面点的方法,通过该方法选择的地面点之间的距离是变化的,而连接这些所选地面点的模拟地面线也较好地吻合了实际地面线,因此利用这些地面点估算所得到的路基土石方数量结果将会比较精确。

3.Based on the practical engineering, a method of Excel programming used for computingsubgrade earthwork is introduced, and discussed in details the principle, function, and programming.结合工程实例,介绍了一种用Excel电子表格进行编程计算路基土石方数量的方法。

英文短句/例句

1.Brief talk on the influence of subgrade earthwork construction method on project cost浅谈路基土石方施工方法对工程造价的影响

2.Study on Controlling Methods of Compactive Quality of Subgrade Filled with Earth-Rock Mixtures;土石混填路基压实质量控制方法研究

3.A Method Study of Rapid Determination on Compaction Quality of Soil-Rock Embankment;土石混填路基压实质量快速评定方法研究

4.Study on a Technique for Detecting Compactness of Soil-Rock Mixture Subgrade Based on Static Load Test;基于静载试验的土石混填路基压实度检测方法探讨

5.a foundation of earth or rock supporting a road.支撑公路的用泥土或岩石做的路基。

6.a foundation of earth or rock supporting a road or railroad track.支撑公路或铁路的用泥土或岩石做成的路基。

7.Subgrade and Pavement Disposal Project for Guangxi Pingguo-Baise Highway广西平百路特殊土路基路面处理方案

8.A CBR Experimental Analysis on Mixing Quick Lime into Loess Roadbed黄土路基掺入生石灰的CBR试验分析

9.Cement Pulverized Coal Ash Broken Stone Marker Processing Road Soft Soil Ground水泥粉煤灰碎石桩处理公路软土地基

10.Construction of Concrete-gunite and Grass-planting for Protection of Lithic Subgrade Slope石质路基边坡喷植混凝土护坡的施工

11.The steamroller levelled off the gravel roadbed and then the concrete was poured.蒸汽压路机压平碎石路基,然后浇注混凝土。

12.Expansive Soils Stabilized by Lime Used in Filling Highway Embankment;石灰改良膨胀土在高速公路路基填筑中的应用

13.The application of lime improvement soil in the roadbed project of He-liu expressway石灰改善土在合六高速公路路基工程中的应用

14.THE APPLICATION OF LIME IMPROVEMENT SOIL IN THE ROADBED PROJECT OF HEFU EXPRESSWAY石灰改善土在合阜高速公路路基工程中的应用

15.Ground Temperature Characteristic Analysis on Rubble Slope Embankment and Gravel Pavement Embankment of Qinghai-Tibet Railway Permafrost Region;青藏铁路多年冻土区碎石护坡与片石护道路基地温特性分析

16.The Test Study on Improved Phosphogypsum Used as the Roadway s Filling;磷石膏改良土用作路基及基层填料的试验研究

17.Application of Recombination Foundation of Piers Dynamically Compacted in Treatment of Soft Soil Subgrade强夯碎石墩复合地基在软土路基处理中的应用

18.Research of the Method to Predict Settlement on Soft-soil Ground in Expressway;高速公路软土路基沉降预测方法研究

相关短句/例句

soil-rock foundation土石路基

3)rock embankment石方路基

1.Quality control ofrock embankment in subgrade engineering路基工程中的石方路基质量控制

4)stonework of subgrade路基石方

5)earth roadbed土方路基

1.Research on method of determining elastic deformation criterion forearth roadbed;土方路基回弹弯沉检测标准确定方法研究

2.This article links to the reality emphatically,introduce theearth roadbed strong hang construction quality control standard and design stipulation.文章结合实际,介绍了土方路基强夯施工质量控制标准与设计规定。

6)roadbed earthwork路基土方

1.The article introduces in detail the gist and methods of the construction quality control in theroadbed earthwork of road work at the embankment top.该文从堤顶道路路基土方工程各施工步骤着手,详细介绍了堤顶道路路基土方工程施工质量控制的要点与方法。

延伸阅读

路基土石方施工在铁路或公路建设中,路基土石方是一种工程量大、劳动量多、施工条件复杂多变的工程。地形复杂的山区,高填深挖,每公里土石方量可达1~10万米3。崩坍、滑坡、泥石流、岩溶、软土等(见自然地质作用和工程地质作用)复杂的不良工程地质地段,还会给施工带来很大困难。因此,必须预先做出施工组织计划,在满足质量要求、讲究生产效率的前提下,确定施工方法,选定施工机械,编制施工进度计划,设计工点施工平面图,计算施工机具和劳动力等资源需要量,组织路堑的开挖、路堤的填筑和各种路基附属构筑物的修筑工作,以及路基土石方调配。一些和路基施工有关工作,例如施工排水,取弃土地点的布置,和隧道出碴、桥头填土在施工顺序上的配合协调等,也必须周密安排。解决这些施工组织问题的技术文件,就是路基土石方工程实施性施工组织设计。施工方法 有:①人工施工。②小型机具半机械化施工。可以适量降低人工劳动强度和提高施工速度。所谓小型机具,一般是指结构比较简单、制造加工方便、利用简单的机械原理和动力进行操作的简易机械,如手推车、翻板车、索道等。③机械化施工。在很多国家广泛使用,中国在50年代也开始重视了路基土石方施工机械化的发展;和世界工业先进国家一样,也逐步向综合机械化方向迈进,亦即在路基土石方工程的每个工序上,挖、装、运、卸、压以及炮眼钻孔等,都使用机械,并使生产率彼此协调,能发挥最高效率。④爆破施工。在开挖岩石路堑,扬弃大量土石方,开挖冻土,以及在沼泽中扬弃淤泥换土时,都可应用爆破方法施工(见爆破技术)。在易于冲松和渗水的土体、充足的水源和廉价的电力情况下,还可采用水力机械化方法施工,即用高压水枪冲松路堑的土体,用水槽或管道将泥浆流送到路堤位置,渗除水分而形成路堤。对于特殊的施工条件(例如改建工程和铁路第二线施工)和复杂的不良工程地质条件,必须采取特殊的施工组织措施和特殊的施工方法,才能保证施工的安全和路基构筑物的稳定。路基土石方工程机械 路基土石方施工中,一般都应用铲运机、挖掘机(见挖掘机械)和推土机(见彩图)。这几种主导机械都属一机多能型,适用于在夹石土体或经过爆破松动的石方中施工,但对石方粒径要有一定限制。和主导机械配合使用的,还有松土机、羊足碾、压路机、平地机、挖沟机等辅助机械。土石方施工机械始终在沿着能量大、重量轻、通用性强的方向发展。 施工方法的选择 施工方法主要从技术和经济两方面选定。技术方面主要根据土石方调配方案、运输距离、土石方数量、工期要求、工点宽窄程度、土的性质、地形特点、填挖高度、气候条件、燃料和工程用水条件等进行考虑。经济方面主要根据主导机械和劳动力所能发挥的生产效率、每立方米土石方的生产成本和能源消耗等指标进行考虑。在综合机械化施工中,施工机械的选型和配套是选择施工方法的重要环节。施工进度计划 用以指导和控制土石方工程施工进程,表明每个工作面在各个施工时期内各应完成的土石方工作量,作出时间与空间关系的合理安排,确保整个工程按计划完成。工地施工平面图 表现路基土石方工程施工地点各种空间安排的平面图。图中主要表明路基构筑物的位置,取土坑(场)和弃土堆(场)的位置,施工机械的工作路线和走行路线,以及现场其他设施的位置等。

本内容不代表本网观点和政治立场,如有侵犯你的权益请联系我们处理。
网友评论
网友评论仅供其表达个人看法,并不表明网站立场。