100字范文,内容丰富有趣,生活中的好帮手!
100字范文 > 复合第一类吸收式热泵机组 Combined First-type Absorption heat pump unit英语短句 例句大全

复合第一类吸收式热泵机组 Combined First-type Absorption heat pump unit英语短句 例句大全

时间:2022-02-03 22:13:30

相关推荐

复合第一类吸收式热泵机组 Combined First-type Absorption heat pump unit英语短句 例句大全

复合第一类吸收式热泵机组,Combined First-type Absorption heat pump unit

1)Combined First-type Absorption heat pump unit复合第一类吸收式热泵机组

2)absorption heat transformer第二类吸收式热泵

1.The feasibility of the scheme,utilizing theabsorption heat transformer to recover the geothermal waste heat,was discussed by simulating the thermodynamic cycle of the LiBr/H2Oabsorption heat transformer.通过对溴化锂第二类吸收式热泵系统的模拟计算,分析研究了利用第二类吸收式热泵技术回收地热余热方案的可行性。

2.A steady state simulation model had been developed to predict the performance of theabsorption heat transformer system using LiBr/H2O as working pair.根据溴化锂第二类吸收式热泵系统的传热、传质平衡以及各部件的传热关系,建立了系统的稳态数学模型,分析了系统主要参数对系统性能的影响。

3.AHT doesn’tneed high grade useful heat energy,so utilizingabsorption heat transformer to recovergeothermal waste heat can be a promising method for heat recovery.第二类吸收式热泵是一种能够回收中低温废热,从而获得高温有用热能的装置,它不需要输入高温的有用能,所以节能效果显著。

英文短句/例句

1.Research of Absorption Heat Transformer with Falling Film Inside Tubes;管内降膜式第二类吸收式热泵的实验研究

2.Designand Simulation of the LiBr/H_2O Absorption Heat Transformer;溴化锂第二类吸收式热泵的设计与仿真研究

3.Optimization Design and Simulation Research on the Absorption Heat Transformer for Recovering the Low-temperature Waste Heat;低温热源驱动第二类吸收式热泵的模拟优化研究

4.Experimental Study on the Absorption Heat Transformer for Recovering the Low-temperature Waste Heat;低温热源驱动溴化锂第二类吸收式热泵的实验研究

5.Technological Design of the Absorption Heat Pump Operated in Bimodal Modes;双模式运行的第一类吸收式热泵的工艺研究

6.Single and double effect combined LiBr absorption heat pump单双效结合运行的溴化锂第一类吸收式热泵

7.Study on the optimizing work range and application of typeⅠlithium bromide absorption heat pump第一类溴化锂吸收式热泵最佳工作域及其在工程中的应用

8.ANALYSIS OF HEAT AND MASS TRANSFER OF THE FALLING FILM ABSORBER IN THE OPEN CYCLE ABSORPTION HEAT PUMP开式吸收式热泵降膜吸收器热质传输研究

9.THERMODYNAMIC ANALYSIS AND EXPERIMENTAL STUDY OF HIGH TEMPERATURE ABSORPTION HEAT PUMP CYCLE FOR WATER/GLYCOL水/乙二醇高温吸收式热泵循环的热力分析及实验研究

10.Investigations on the Thermodynamic Optimization for the Four-Temperature-Level Absorption Heat Pump四温位吸收式热泵的热力学优化研究

11.The Cycle and Performance Analysis for Two-stage Absorption Heat Pump Type-ⅡⅡ型两级吸收式热泵循环及性能分析

12.Study on the of Performance Thermosyphon Pump of Libr Absorption Refrigerator;小型溴化锂吸收式制冷机热虹吸泵的特性研究

13.Application Study of Absorption Heat Pump Technology in CHP System吸收式热泵技术在热电联供中的应用研究

14.BUILDING SMALL PERFORMANCE ANALYSIS OF AMMONIA ABSORPTION HEAT PUMP WITH THERMAL-ENERGY STORAGE OF OFF-PEAK POWER利用“低谷电”蓄热的氨吸收式热泵小型化系统

15.Theoretical Analysis of Open Cycle Absorption Heat Transformer and Experiment on Absorber and Generator;开式循环吸收式热泵理论及部件实验研究

16.THE OFF-DESIGN PERFORMANCE OF OPEN CYCLE ABSORPTION HEAT TRANSFORMER开式循环吸收式热泵系统变工况性能研究

17.Application of Horizontal AHT in BR Plant吸收式热泵(卧式)技术在顺丁橡胶装置上的应用

18.Effective Means of Environmental Protection and Energy Saving── Absorption Heat Pump工业环保与节能的有效手段──吸收式热泵技术

相关短句/例句

absorption heat transformer第二类吸收式热泵

1.The feasibility of the scheme,utilizing theabsorption heat transformer to recover the geothermal waste heat,was discussed by simulating the thermodynamic cycle of the LiBr/H2Oabsorption heat transformer.通过对溴化锂第二类吸收式热泵系统的模拟计算,分析研究了利用第二类吸收式热泵技术回收地热余热方案的可行性。

2.A steady state simulation model had been developed to predict the performance of theabsorption heat transformer system using LiBr/H2O as working pair.根据溴化锂第二类吸收式热泵系统的传热、传质平衡以及各部件的传热关系,建立了系统的稳态数学模型,分析了系统主要参数对系统性能的影响。

3.AHT doesn’tneed high grade useful heat energy,so utilizingabsorption heat transformer to recovergeothermal waste heat can be a promising method for heat recovery.第二类吸收式热泵是一种能够回收中低温废热,从而获得高温有用热能的装置,它不需要输入高温的有用能,所以节能效果显著。

3)AHT第二类吸收式热泵

1.Absorption heat transformers (AHTs ) for upgrading of heat are useful for heat recovery of low-level thermal energy.第二类吸收式热泵(Absorption heat transformer,简称AHT)主要应用于低温废热的回收,在工业应用中,第二类吸收式热泵将低温废热中的部分热量加以回收利用,以减少对能源的消耗和浪费。

2.Because there are usually lots of low-temperature waste heat discharged from the process of supplying heat in winter by the hot geothermal water, this paper proposes an energy-saving scheme using theAHT system to recovery the geothermal waste heat.第二类吸收式热泵是回收低温位热能的有效装置之一。

3.Absorption heat transformers(AHT) for upgrading of heat is very useful for heat recovery of low-level thermal energy,In industrial applications,AHT takes thermal energy from a low-temperature process stream and deliver it to a higher-temperature process.在工业应用中,第二类吸收式热泵将废热中的部分热量加以回收利用,以减少对能源的消耗和浪费。

4)Type II high temperature absorption heat pump第二类高温型吸收式热泵

5)absorption heat pump吸收式热泵

1.Study on the recovery of waste heat produced in custic soda evaporation procedureby adoptingabsorption heat pumps;利用吸收式热泵回收烧碱蒸发工段废热的研究

2.Pilot-plant research ofabsorption heat pump for recovery of low temperature stripping heat;吸收式热泵回收凝聚过程废热的中试研究

3.Effective Means of Environmental Protection and Energy Saving── Absorption Heat Pump;工业环保与节能的有效手段──吸收式热泵技术

6)absorption heat transformer吸收式热泵

1.Influence analysis of temperatures on coefficient of performance ofabsorption heat transformer operating with water/lithium bromide;温度参数对升温型溴化锂吸收式热泵性能系数影响程度分析

2.The Absorption Heat Transformer (AHT) can realize the recovery of waste heat.吸收式热泵采用吸收的方法实现热泵的循环 ,把低品位的废热提高到高品位 ,从而实现废热回收利用。

3.The mathematical model ofabsorption heat transformer operating with water/lithium bromide was built.分析了温度参数对升温型溴化锂吸收式热泵性能系数的影响,通过对升温型溴化锂吸收式热泵建立数学模型,得到在相同工况条件下,发生温度的变化对系统性能系数的影响程度最大,但小于吸收温度和冷凝温度对系统性能系数影响程度之和。

延伸阅读

埋管式地源热泵技术促进节能产业直接利用地下土壤和地上空间季节性温度差,在夏季用于空调制冷、在冬季用于供暖供热的设想,如今已经变为现实。目前,这项地源热泵新技术经过众多天津市科研技术人员多年的反复试验已获得成功,天津市企业又将该技术发展为埋管式地源热泵,应用范围更加广泛。该技术现已运用在天津市红桥区老干部活动中心等工程中。 目前,国家鼓励发展可再生能源和新能源的高技术产业专项,其中太阳能供热和地源热泵供热制冷被列入重点领域。据介绍,地下土壤中蕴藏着丰富的温度资源,夏季地下土壤的温度低于地上空间的温度,冬季地下土壤的温度高于地上空间的温度。地源热泵技术就是利用这种季节性温度差,通过专门装置在夏季将地下土壤的低温资源转换到地上空间制冷,在冬季将地下土壤的高温资源转换到地上空间供热。而埋管式地源热泵更为直接,它把换热器埋设在土壤中,管内有密闭的水循环与土壤进行热量的交换,冬天吸收土壤蕴藏的热量,夏天把热量释放到土壤中储存,待冬天再用,对地下水资源不会造成影响。采用这种技术制造的中央空调不燃油、不燃气、不燃煤,根据需要灵活控制,开关由己,冷暖自如。 技术人员介绍说,按全市房屋施工面积3000万平方米计算,如果其中1000万平方米建筑采用埋管式地源热泵技术,每年可节约标准煤11.9万吨,可减少烟气排放量13亿立方米,并且比传统中央空调系统运行费降低30%到60%。

本内容不代表本网观点和政治立场,如有侵犯你的权益请联系我们处理。
网友评论
网友评论仅供其表达个人看法,并不表明网站立场。