100字范文,内容丰富有趣,生活中的好帮手!
100字范文 > 主梁施工 main beam construction英语短句 例句大全

主梁施工 main beam construction英语短句 例句大全

时间:2024-08-03 09:39:04

相关推荐

主梁施工 main beam construction英语短句 例句大全

主梁施工,main beam construction

1)main beam construction主梁施工

bined with characteristics of themain beam construction of the Yun Yang Yangtse River Highway Bridge, the technical measurements of long-span cable -stayed bridge are introduced in the dynamic state in this paper from the constr uction measurement.结合云阳长江公路大桥主梁施工的特点,介绍了动态施工中大跨斜拉桥主梁施工测量的有关技术。

英文短句/例句

1.On Bailey Beam Support System Used in the Construction of Self-anchor Suspension Bridge用贝雷梁支架系统进行自锚式悬索桥主梁施工

2.Girder Construction Technique of Single Tower Cable-stayed Curve Bridge Without Back Cable独塔无背索弯坡斜拉桥主梁施工技术

3.Technical Study on Construction of PC Main Girder for Yibin Yangtze River Bridge宜宾长江大桥PC主梁施工技术探讨

4.On Gate Hoist Girder Construction Stent Design of Jinyintai Navigation and Hydropower Project金银台航电枢纽闸门启闭机主梁施工支架设计

5.Alignment Control of Cable-stayed Bridge Girder during Construction徐州市和平路斜拉桥主梁施工线形控制

bined with characteristics of the main beam construction of the Yun Yang Yangtse River Highway Bridge, the technical measurements of long-span cable- stayed bridge are introduced in the dynamic state in this paper from the constr uction measurement.结合云阳长江公路大桥主梁施工的特点,介绍了动态施工中大跨斜拉桥主梁施工测量的有关技术。

7.Study on the Contents and Methods of Monitoring and Measuring in Large-span Cable-stayed Bridge Girder s Construction;大跨径斜拉桥主梁施工监控测量内容与方法研究

8.Brief Analysis Cross River Road Main Span Box Hangs Fills Constructs Craft浅析跨江公路主桥箱梁悬灌施工工艺

9.The Research on Construction Control in the Incremental Launching of Main Girder of Cable-stayed Bridge with Steel Box Girder钢箱梁斜拉桥主梁顶推法施工阶段控制研究

10.Cantilever Construct Technology for Main Box Girder of Fengpu Bridge;奉浦大桥主桥箱梁悬臂浇筑施工技术

11.Load Reaction Analysis of the Girder of YongAn Bridge During Construction Procedure;抚顺永安桥施工阶段主梁的受力分析

12.The construction craft of Communism trench big Bridge combination beam prepared共产主义渠大桥组合箱梁预制施工工艺

13.Closing of the Cable-stayed Wuhu Yangtze River Bridge Middle Main Span of Steel Truss Beam芜湖长江大桥主跨钢桁梁斜拉桥跨中合龙施工

14.Design and Construction Control for the Partial Dismantlement of the Main Girder of Zhaobaoshan Bridge in Ningbo宁波招宝山大桥主梁局部拆除设计及施工控制

15.Construction"s Simulate Calculation of A Cable-stayed Dual-purpose Bridge with Steel Girder for Highway and Light Rail Traffic公轨两用钢主梁斜拉桥的施工仿真计算

16.Closuring Construction Technology of Main Bridge for Prestressed Concrete Continuous Girder Bridge预应力混凝土连续梁桥主桥合龙施工技术

17.Design of Hanging Basket Construction Process in Wanshandang Bridge宛山荡大桥主桥箱梁挂篮施工组织设计

18.Analysis and Construction Technology of Lower Cross Beam Pre-stressing of Main Pylon of Minpu Bridge Ⅱ闵浦二桥主塔下横梁预应力分析及施工技术

相关短句/例句

suspension casting of girder主梁悬浇施工

3)bent girder construction stent排架主梁施工支架

4)bridge construction桥梁施工

1.Approach and application cases of assembled Martial Berrt Truss in thebridge construction;军用贝雷组合桁架在桥梁施工中的应用实例与探讨

2.On the precautions of borehole cast-in-place concrete pile used inbridge construction;钻孔灌注桩在桥梁施工中的应用及注意事项

3.Analyses method about real values of stress inbridge construction survey;桥梁施工监测应力真值分析方法

5)box girder construction箱梁施工

6)beamless construction扁梁施工

延伸阅读

施工企业技术组织措施计划(见施工企业技术)施工企业技术组织措施计划(见施工企业技术)technical and organize measurement plan in construction enterprise施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。

本内容不代表本网观点和政治立场,如有侵犯你的权益请联系我们处理。
网友评论
网友评论仅供其表达个人看法,并不表明网站立场。