100字范文,内容丰富有趣,生活中的好帮手!
100字范文 > 博斯腾湖东泵站工程 east pump station engineering at Bostan Lake英语短句 例句大全

博斯腾湖东泵站工程 east pump station engineering at Bostan Lake英语短句 例句大全

时间:2019-06-04 20:13:06

相关推荐

博斯腾湖东泵站工程 east pump station engineering at Bostan Lake英语短句 例句大全

博斯腾湖东泵站工程,east pump station engineering at Bostan Lake

1)east pump station engineering at Bostan Lake博斯腾湖东泵站工程

英文短句/例句

1.Application of high performance concrete pumping construction in east pumping station project in Bostan Lake高性能混凝土泵送施工在博斯腾湖东泵站工程中的应用

2.Application of bag-form concrete to construction of slope protection for separation dike of Lake Bostan模袋混凝土在博斯腾湖隔堤护坡工程中的应用

3.Differentiation of Water-salt-interaction in Bostan Lake and Peacock River in Recent Fifty Years近50年博斯腾湖与孔雀河水盐演变过程

4.AN APPROACH TO MINERALIZATION TREND-SURFACE ANALYSIS IN BOSTEN LAKE博斯腾湖水矿化度趋势面分析初探

5.Analysis on the Restoration of Water Level of the Bosten Lake in Xinjiang after 1987;1987年后博斯腾湖水位的还原分析

6.Sediment Records of Heavy metal Pollution in Bosten Lake,Xinjing新疆博斯腾湖重金属污染的沉积记录

7.The Analysis of Time-series Runoff Data of the Main Inflow Rivers in the Boston Basin;博斯腾湖流域主要入湖河流径流序列分析

8.Study on Control Method for Prevention from Concrete Crack Based on Concrete Pumping Construction of the Pumping Station of Wannian Sluice of the South-to-North Water Diversion Project南水北调工程山东万年闸泵站泵送混凝土施工防裂方法研究

9.Several Problems about Step Pump Stations in Eastern Route South-to-North Water Transfer Project南水北调东线工程梯级泵站的几个问题

10.Study on Source Pump Station Optimal Operation of the First-stage Project of Eastern Route of South-to-North Water Transfer;南水北调东线一期工程源头泵站优化运行研究

11.In the light of characteristics of south-to-north water transfer project in the east of China, the requirements of step pump stations of the project for pump units are analyzed.针对南水北调东线工程特点,分析了其梯级泵站对主泵机组的要求。

12.Model Acceptance Test of the Baoying Pumping Station in the South-to-North Water Project南水北调东线一期工程宝应泵站水泵装置模型验收试验成果分析

pilation of Pump Procurement Bidding Documents of the Baoying Pumping Station in East Route Project of South-to-North Water Diversion;南水北调东线工程宝应泵站水泵采购招标文件编写中的有关问题

14.The Acceptance Test of the Model Pump Systerm of Linjiaba Pumping Station in the Eastern Route First-stage Project of the South-to-North Water Transfer Project南水北调东线一期工程蔺家坝泵站水泵模型装置验收试验

15.Analysis of Climatic Factors of Formation of Asiatic Migratory LocustFirestorm in Xinjiang Bosteng Lake新疆博斯腾湖亚洲飞蝗大暴发气候成因分析

16.RESOURCES SUSTAINABLE UTILIZATION AND ENVIRONMENT PROTECTION OF BOSTON LAKE, XINJIANG博斯腾湖环境与资源的保护和可持续利用

17.Research on Evaluation of Tourism Carrying Capicity in Bosten Lake;博斯腾湖风景区旅游环境承载力评价研究

18.Bo Siteng Lake tourism resource development’s present situation and solution countermeasure;博斯腾湖旅游资源开发现状及解决对策

相关短句/例句

Bosten Lake博斯腾湖

1.The Application Of Factor Analysis Method to the Water Quality Assessment inBosten Lake;博斯腾湖水质综合评价因子分析方法

2.Salinity Analysis ofBosten Lake;博斯腾湖矿化度现状分析

3.Influence of Water Level Change ofBosten Lake on Wetland Eco,Environment;博斯腾湖水位变动对湿地生态环境的影响

3)the Bosten Lake博斯腾湖

1.Study on the evaluation of ecological frangibility of the wetlands inthe Bosten Lake Region;博斯腾湖湿地生态脆弱性评价研究

2.Analysis on Development of Ecological Tourism inthe Bosten Lake of Xingjiang;新疆巴州博斯腾湖生态旅游发展分析

3.Study on the Change of Inflow and Salt Content ofthe Bosten Lake, Xinjiang since the 1950s;20世纪50年代以来博斯腾湖水盐变化及趋势

4)Lake Bosten博斯腾湖

1.Study on Ecological Protection Planning ofLake Bosten;博斯腾湖生态保护规划方案研究

2.Study of Water Environmental Capacity inLake Bosten in Xinjiang;新疆博斯腾湖水环境容量研究

3.Primary study on the environmental significances of grain-size changes of theLake Bosten sediments;新疆博斯腾湖沉积物粒度的古环境意义初探

5)bositeng lake博斯腾湖

1.Study on Bositeng Lake Water Quality by Dissolved Oxygen Content Variety;从溶解氧含量变化分析博斯腾湖水质现状

2.Study on variety trend and control about mineralization degree of Bositeng Lake;博斯腾湖水体矿化度变化趋势及调控研究

3.Research on Developing Circulation Economy in BOSITENG Lake Region;环博斯腾湖地区发展循环经济研究

6)Bostan Lake博斯腾湖

1.Differentiation of Water-salt-interaction inBostan Lake and Peacock River in Recent Fifty Years;近50年博斯腾湖与孔雀河水盐演变过程

2.Because of its rich resources and favorable environment,Bostan lake had favorably adjusted the.博斯腾湖的功能是多方面的,在南疆经济建设中很重要。

3.Through the calculations of evaporation and freezing heat balance at the water surface ofBostan Lake, Mr.荣其瑞同志通过博斯腾湖湖面蒸发和结冰的热量平衡计算,得出湖面至2。

延伸阅读

博斯腾湖博斯腾湖中国新疆最大的淡水湖泊。位于新疆维吾尔自治区中部焉耆盆地的一个山间陷落湖。又称巴喀赤湖,北魏《水经注》称为敦薨浦。湖面海拔1048米,南北宽约25千米,东西长约55千米。湖水面积1019平方千米,最大水深15.7米,蓄水量99亿立方米。汇入湖泊的河流主要来自西北的开都河、马拉斯台河等,多年平均入湖径流量为26.8亿立方米,经西南部的孔雀河排出,平均每年出流量为12.5亿立方米,穿铁门关峡谷,进入库尔勒地区,最后汇入罗布泊。在铁门关建有新疆最大的水电站。20世纪60年代后,由于库尔勒地区工农业用水量不断增加,每年要求加大出湖水量,已引起湖水位下降,湖面缩小,湖水矿化度逐年升高,今已演变成一个微咸水湖泊。原产的塔里木裂腹鱼(俗称尖头鱼)、扁吻鱼(俗称大头鱼)和长头鱼等资源已衰减。造纸用的芦苇资源相当丰富。总面积40万公顷。博斯腾湖风光

本内容不代表本网观点和政治立场,如有侵犯你的权益请联系我们处理。
网友评论
网友评论仅供其表达个人看法,并不表明网站立场。