100字范文,内容丰富有趣,生活中的好帮手!
100字范文 > 钢混结构 reinforced concrete structures英语短句 例句大全

钢混结构 reinforced concrete structures英语短句 例句大全

时间:2022-12-17 14:11:53

相关推荐

钢混结构 reinforced concrete structures英语短句 例句大全

钢混结构,reinforced concrete structures

1)reinforced concrete structures钢混结构

1.Study on damage toreinforced concrete structures by impacting of an aircraft;钢混结构物受外来飞射体撞击的破坏效应研究

2)steel-concrete structure钢-混结构

3)hybrid steel structure混合钢结构

putation and analysis onhybrid steel structure of tubular truss-cable net;管桁架—索网混合钢结构的计算分析

4)Steel-RC mixed structures钢-混混合结构

5)steel-reinforced concrete mixtures钢-钢筋混凝土混合结构

6)reinforced concrete structure钢筋混凝土结构

1.Factors influencing the reliability ofreinforced concrete structure in construction period;浅析影响钢筋混凝土结构施工期可靠性的因素

2.The protection and control of the crack inreinforced concrete structure;钢筋混凝土结构裂缝的预防和控制

3.Analysis methods of the reliability of thereinforced concrete structure;钢筋混凝土结构可靠度分析方法

英文短句/例句

1.precast reinforced concrete construction装配式钢筋混凝土结构

2.steel composite constructio劲性钢筋混凝土结构

3.connection in reinforced concrete structure钢筋混凝土结构的连接

4.The Influence for Setorer of Reinforcing Bar at Reinforced Concrete Structure;析钢筋偏位对钢筋混凝土结构的影响

5.Application in the Skyscraper of the Steel - Concrete Construction;钢-钢筋混凝土结构在高层建筑的应用

6.Fireproof Design and Computation of Reinforced Concrete Component;钢筋混凝土结构构件防火设计与计算

7.The Method of Determining the Actual Stress of Reinforcing Bar in the Undestroyed Reinforced Concrete Structure非破坏钢筋混凝土结构钢筋实际应力测定法

8.Research on the Mechanical Properties of the Corroded Reinforcement Bar in Reinforced Concrete Structures;钢筋混凝土结构中锈蚀钢筋性能退化规律研究

9.An Analysis on Reasons for Corrosion in Steel Bars of Ferroconcrete Structure and Relevant Solutions钢筋混凝土结构中钢筋锈蚀原因分析及处理

10.Technical specification for reinforced concrete structures with cold-rolled and twisted bars冷轧扭钢筋混凝土结构技术规程

11.Technical specification for concrete structures with cold rolled ribbed steel wires and bars冷轧带肋钢筋混凝土结构技术规程

12.Code for design of hydraulic concrete structures水工钢筋混凝土结构设计规范

13.box frame type reinforced concrete construction箱形框架式钢筋混凝土结构

14.Reinforced Concrete & Brick Structure钢筋混凝土及砖石结构

15.The Finite Element Analysis of Cable-Steel-Reinforced Concrete Structure;索—钢—钢筋混凝土组合结构有限元分析

16.Durability Design of a Reinforced Concrete Retaining Wall某钢筋混凝土挡土墙结构耐久性设计

17.Observation of reinforcing work quality of cast-in-place reinforced concrete structure现浇钢筋混凝土框架结构钢筋工程质量的监理

18.Specification for design of reinforced concrete shell structures钢筋混凝土薄壳结构设计规程

相关短句/例句

steel-concrete structure钢-混结构

3)hybrid steel structure混合钢结构

putation and analysis onhybrid steel structure of tubular truss-cable net;管桁架—索网混合钢结构的计算分析

4)Steel-RC mixed structures钢-混混合结构

5)steel-reinforced concrete mixtures钢-钢筋混凝土混合结构

6)reinforced concrete structure钢筋混凝土结构

1.Factors influencing the reliability ofreinforced concrete structure in construction period;浅析影响钢筋混凝土结构施工期可靠性的因素

2.The protection and control of the crack inreinforced concrete structure;钢筋混凝土结构裂缝的预防和控制

3.Analysis methods of the reliability of thereinforced concrete structure;钢筋混凝土结构可靠度分析方法

延伸阅读

钢管混凝土结构施工钢管混凝土结构施工construction of concrete depositing steel pipe structuregangguan hunn旧gtuJ一egou shjgong钢管混凝土结构施工(eonstruetion of con-erete depositing steel pipe strueture)钢管混凝土结构是利用钢管与灌入管中的混凝土共同作用的原理设计的一种复合结构。它兼有钢管结构和钢筋混凝土结构的优点,承载力较高,塑性和韧性较好,可节省材料,缩短工期,目前已在工业和民用建筑工程柱系统中应用。钢管混凝土结构柱施工程序如图。六饰(定施讨月管柱八开设扫卜心月管柱八卜部结矛匆尧灌僧汾、处理陇乃回流装里 钢管混凝土柱施工程序网络图钢梵段节的制作管材优先采用螺旋焊接钢管,也可用滚床自行卷管,卷管方向应与金属压延方向一致。根据板厚开始板端坡口,坡口端应与管轴垂直,尽可能采用自动焊接。管肢和各种腹杆焊成后都需进行构件调直。过长的管肢无法进行运输时,应在制作厂进行预组装,经检查合格后再拆开分段运输。部件组合拼装制成的钢管段节,经检验合格后严格按照规定的工艺要求程序在专用胎具上进行拼装组合,并注意下列事项:(1)管肢对接宜采用分段反向焊接工艺.严格保持焊后管肢的平直。焊接前对小口径钢管应采用点焊定位;对大口径钢管可用附加筋在管外作对口联焊。(2)重要受力管肢,应在管内接缝处加设附加垫圈,并与管内壁保持0.smm的膨胀间隙,以确保焊缝根部质量。(3)主肢钢管与附属焊件的间隙应按饭金展开图进行放样和切割。当节点处的焊接道数较多时,应选择合理的焊接顺序,以减少焊接内应力与变形。(4)钢管构件经检查合格后,应按设计要求进行防腐处理。结构件安装为了加快安装进度和减轻吊装重量,宜先将空管构件按承重骨架方式进行安装,然后再向管内填灌混凝土。事先应对钢管结构进行强度和稳定性验算。对于多层框架结构可采取分层施工、构件分层安装和分层灌筑混凝土的方法。为了减少柱肢的安装接头,尽可能采用长柱吊装法,即一次吊装的柱高范围可以有2~5层梁板,这样可构成空间框架,为各层主次梁安装及楼板施工提供工作面,以便于进行主体交叉作业。长柱擂入杯口后应立即校正、加固,填筑混凝土固定柱脚,并用缆绳加以固定,然后吊装机械方可脱钩,在杯口二次灌浆后拆除缆绳。第一层钢管柱和主、次梁内混凝土填筑完毕后,结构已有稳固的基层。第二节柱肢的安装。可依靠塔吊式起重机对中校直,完成第一道焊缝后脱钩,然后进行补焊。管内混凝土填筑空钢管安装成竖向构件后,混凝土采用竖向灌筑补充,由于抛落高度大,混凝土凭其自重无需振捣即能冲压密实。

本内容不代表本网观点和政治立场,如有侵犯你的权益请联系我们处理。
网友评论
网友评论仅供其表达个人看法,并不表明网站立场。