100字范文,内容丰富有趣,生活中的好帮手!
100字范文 > 大断面暗挖进洞 big-sectional undermining entering hole英语短句 例句大全

大断面暗挖进洞 big-sectional undermining entering hole英语短句 例句大全

时间:2024-03-03 01:49:38

相关推荐

大断面暗挖进洞 big-sectional undermining entering hole英语短句 例句大全

大断面暗挖进洞,big-sectional undermining entering hole

1)big-sectional undermining entering hole大断面暗挖进洞

2)large-section excavation大断面开挖

1.This paper analyzes the feasibility of adopting thelarge-section excavation in soft wall rock tunnel, introduces the new techniques of the smooth blasting on the arch part of peripheral hole and the side-wall presplitting blasting, which provide some practicable experiences for the tunnel excavation under similar conditions.分析了软弱围岩隧道采用大断面开挖的可行性,介绍了周边孔拱部光面爆破、边墙预裂爆破的新技术,为类似条件下的隧道开挖提供一些可行经验。

3)large section cavity大断面洞库

4)large section tunnel大断面隧洞

1.The numerical simulation analysis oflarge section tunnel construction大断面隧洞施工的数值模拟分析

英文短句/例句

1.The Design and Application of the Movable Steel Mould Plate used in the Tunnels with Outsized Sections;特大断面隧洞钢模台车的设计和应用

2.Numerical simulation of preliminary lining of large section crossing tunnels constructed with PBA method洞桩法大断面群洞交叉隧道初衬数值模拟

3.Construction Technology of Large Cross-Section Diversion Tunnel of Shuibuya Water Conservancy;水布垭水利枢纽特大断面导流隧洞施工技术

4.Landslide Management Technologies for Hydraulic Tunnel with Large Section in Shatter Layer;破碎地层大断面水工隧洞塌方治理技术

5.Grouting Construction Technology of Long Hydraulic Tunnels with High Crustal Stress and Large Cross-sections高地应力大断面特长水工隧洞灌浆施工技术

6.Key Techniques for Arched Heading Excavation of Large-cross-section Loess Tunnels大断面黄土隧道弧形导洞法施工关键技术研究

prehensive entering into tunnel construction technology of large section weak surrounding rock tunnel大断面软弱围岩隧道综合进洞施工技术

prehensive Construction Technique Study and Analysis in the Condition of Complicated Geology of Diversion Tunnel with Extra-large Section;复杂地质条件下特大断面导流隧洞综合施工技术研究与分析

9.Study on Technology System of Zero Cave-entrance and Its Application of Large Cross-section Tunnel under Complex Geological Conditions复杂地质条件下大断面隧道“零”进洞工法技术体系及应用研究

10.Application Research of Shield Tunnel Boring Machine on Soft and Hard Rock Engineering in Osaka Tunnel双护盾全断面掘进机在大坂隧洞软硬岩工程中的应用研究

11.Advance Bottom Heading Technology Applied in Hard Rock Mountain Tunnels with Large Cross-section下导洞超前施工技术在大断面山岭硬岩隧道中的应用

12.Discussion on application of tunnel boring machine(TBM) to construction of water conveyance tunnel浅议全断面隧洞掘进机在引水隧洞施工中的应用

13.Full-section Tunnel Construction Technique in Rock Masses and Its Support Alternatives;岩体全断面隧洞施工技术及支护方案研究

14.Calculation of Outfall Pressure and Water Carrying Capacity of Hydraulic Tunnel under Pressure;水工有压隧洞出口断面压强及输水能力的计算

15.Manufacture and Quality Control of Lining Segment of a Construting Tunnel Constructed by TBMTBM全断面掘进隧洞预制管片的施工及质量控制

16.Influence of Tunnel Cross-section Shape on Stress and Displacement of Surrounding Rock断面形状对隧洞围岩位移和应力的影响分析

17.The access tunnel of Yangshan three-stage hydro-power plant is lined around the tunnel at bends and reaches of rock rupture but is nonlined at other reaches.仰山三级电站引水隧洞为不衬砌隧洞,只在弯道段和岩体破碎段进行了全断面衬砌。

18.The Technology Research of Large Section Tunnel Flame-retarded Asphalt Pavement特大断面隧道阻燃沥青路面技术研究

相关短句/例句

large-section excavation大断面开挖

1.This paper analyzes the feasibility of adopting thelarge-section excavation in soft wall rock tunnel, introduces the new techniques of the smooth blasting on the arch part of peripheral hole and the side-wall presplitting blasting, which provide some practicable experiences for the tunnel excavation under similar conditions.分析了软弱围岩隧道采用大断面开挖的可行性,介绍了周边孔拱部光面爆破、边墙预裂爆破的新技术,为类似条件下的隧道开挖提供一些可行经验。

3)large section cavity大断面洞库

4)large section tunnel大断面隧洞

1.The numerical simulation analysis oflarge section tunnel construction大断面隧洞施工的数值模拟分析

5)mining excavation of middle tunnel暗挖中洞法

1.The method ofmining excavation of middle tunnel, with enormous constructing difficulties and great safety risks, was firstly applied in No.目前国内地铁车站完全采用暗挖法施做并已投入使用的仅有北京地铁西单站、天安门西站、东单站和王府井站,主要是采用洞柱法、桩柱法和“双眼睛法”施工,而暗挖中洞法施工技术在国内双层地铁车站中还是首次在北京地铁五号线采用,施工难道大、安全风险大。

6)open excavation changing into hidden hole明挖改暗洞

1.3 contract in Rui-Feng railway,the construction design scheme and construction controlling points ofopen excavation changing into hidden hole construction were introduced.根据瑞枫公路改建工程第三合同ZK7+255~ZK7+310段路基由明挖路基施工改为隧道施工的实例,介绍了明挖改暗洞施工设计方案和施工控制要点,在总结该段浅埋、偏压隧道施工经验的基础上,作了技术经济比较。

延伸阅读

异形断面钢材(见异形断面型材)异形断面钢材(见异形断面型材)special section steel,一、u以uu、’“飞豆on gQngC01异形断面钢材(speeial Seetion steel)见异形断面型材。

本内容不代表本网观点和政治立场,如有侵犯你的权益请联系我们处理。
网友评论
网友评论仅供其表达个人看法,并不表明网站立场。