100字范文,内容丰富有趣,生活中的好帮手!
100字范文 > 下穿既有车站 tunneling under existing station英语短句 例句大全

下穿既有车站 tunneling under existing station英语短句 例句大全

时间:2021-11-30 05:32:12

相关推荐

下穿既有车站 tunneling under existing station英语短句 例句大全

下穿既有车站,tunneling under existing station

1)tunneling under existing station下穿既有车站

英文短句/例句

1.Deformation Analysis of an Existing Subway Station Structure Traversed Down by a Large Shield Tunnel大直径盾构隧道下穿既有车站诱发车站结构变形分析

2.Study on Undercrossing Existing Metro Station Construction Scheme of Beijing Metro Line 4 Xuanwumen Station北京地铁四号线宣武门站下穿既有车站施工方案研究

3.Numerical Simulation of Shield Tunnel Passing under the Existing Subway Station盾构隧道近接下穿既有地铁车站的数值模拟

4.Construction Control of a Newly-Built Subway Station Undercrossing the Existing Subway Tunnel暗挖地铁车站下穿既有地铁隧道施工控制

5.Mechanical Simulation and Analysis of Metro Station on the New Line Cross the Existing;地铁新线车站穿越既有线车站的施工力学分析

6.Research on the Effection and Deformation Control of Double-line Tunnel Undercrossing Existing Subway Station双线暗涵近距离下穿既有地铁车站的影响及变形控制研究

7.Remote monitoring system applied to the construction of metro station undercrossing existing metro tunnel地铁车站下穿既有线隧道施工中的远程监测系统

8.Safety Research on Lining Structures of Subway Station and the Existing Tunnel Underlying地铁车站与下伏既有隧道的衬砌结构安全性研究

9.On analysis of shield construction through existing subway in running tunnel盾构施工下穿既有地铁区间隧道分析

10.Investigation on Construction Technology and Security of Underpassing Metro Station Crossing Railway Ground;地铁车站下穿铁路站场施工技术与安全性研究

11.Research on Protection Schemes for Railway Station in Shield Construction盾构隧道下穿火车站站场保护方案的探讨

12.Research on the Simulation Model of High-Speed Trains" Private Yard under the Condition of Introducing the Passenger-Dedicated Line into Existing Station客运专线引入既有客运站条件下高速车场作业系统仿真模型的研究

13.Design and construction measures for a light-rail station to be built above an existing tunnel既有隧道上方修建轻轨车站的设计与施工对策

14.Study on Construction Technique of Metro Station Driven with Enlarging the Existing Shallow Air Defense Tunnels浅埋既有人防隧道扩挖地铁车站施工技术研究

15.On the Ground Surface Settlement and Existing Line Deformation Caused by the Shallow-burying and Undercutting Construction of Subway Station浅埋暗挖地铁车站地表沉降及既有线变形分析

16.The application of CFG pile in foundation treatment of signal building in existing stationCFG桩在既有车站信号楼地基处理中的应用

17.Technical Study on Observational Method Applied to Shield Tunnel Undergonging Railway;盾构隧道下穿既有铁路信息化施工技术研究

18.Discussion on the construction craft of tunnel in passenger dedicated highway line underpasses through established railway pipe roof客运专线隧道下穿既有铁路管幕施工技术

相关短句/例句

Metro New Line to under-cross the existing station地铁新线下穿既有车站

3)beneath a cluster of existing railway lines下穿既有铁路站场

4)existing station既有车站

1.The application of CFG pile in foundation treatment of signal building inexisting stationCFG桩在既有车站信号楼地基处理中的应用

2.Based on actual case study ofexisting stations reconstruction in Tianjin Metro Line 1, the design methodology for existing metro station reconstruction is described.通过对天津地铁1号线既有车站改建的实例分析,论述了既有地铁车站改建的设计方法,提出了对于其他地铁既有项目也会面临的局部改建和设备更新的问题。

5)Under-crossing existing highway下穿既有公路

6)crossing underneath existing railway下穿既有铁路

延伸阅读

夜袭新丰车站1938年夏,新四军第1、第2支队挺进苏南,积极向宁沪铁路沿线守备薄弱的日军展开袭击和破击作战。经侦悉,镇江至丹阳间的新丰车站仅有日军 1个小队守备,且警戒疏忽。第 1支队遂令第2团第1营进行夜袭。7月1日23时?恚? 1营主力隐蔽迫近新丰车站,突然发起攻击。被惊醒的日军10余人窜出房屋,企图突围,第 1营主力经15分钟白刃格斗,将其歼灭。其余日军据屋顽抗,经喊话仍固守不出,第 1营采取火攻,烧死日军30余人。与此同时,由中共丹北地区组织领导的 8个乡抗日自卫团和当地群众千余人配合行动,协同第 1营一部破路基、拆铁轨、拔电杆、割电线,切断了日军的交通和电话联系。这一胜利,震动了宁沪铁路全线日军,提高了苏南军民的抗日热情,对发展和巩固茅山抗日根据地起了重要作用。

本内容不代表本网观点和政治立场,如有侵犯你的权益请联系我们处理。
网友评论
网友评论仅供其表达个人看法,并不表明网站立场。