100字范文,内容丰富有趣,生活中的好帮手!
100字范文 > 平行换乘 parallel station英语短句 例句大全

平行换乘 parallel station英语短句 例句大全

时间:2022-01-05 22:55:26

相关推荐

平行换乘 parallel station英语短句 例句大全

平行换乘,parallel station

1)parallel station平行换乘

1.Theparallel station is one of them.由于地铁平行换乘车站基坑周围环境的特殊性,其周围位移场分布和围护结构变形与一般基坑明显不同,找出其中的规律对于设计中确定该类基坑的保护等级、施工过程中保护临近已建地铁车站及周围建筑的安全显然具有重要的意义。

英文短句/例句

1.Calculation and Analysis of Influence of Bottom Strengthening on Deformation of Foundation Pit for Parallel Transition Station坑底加固对平行换乘车站基坑变形影响的计算分析

2.Research on the Control of Deformation during Construction of Deep Excavation Adjoining Operating Metro Station;同站厅平行换乘地铁车站深基坑施工变形控制研究

3.To coast, ride, or travel on a toboggan.乘雪撬旅行乘着平底雪撬滑行,乘行或旅行

4.Walking Time Modeling on Transfer Pedestrians in Subway Passages地铁通道换乘乘客走行时间规律研究

5.To go in a punt.乘方头或平底船旅行

6.Study on the Passenger Transfer in Urban Comprehensive Passenger Terminal城市综合客运枢纽旅客换乘行为研究

7.Public-transit Evaluation Based on Average Transfer Times;基于平均换乘的城市公交线网性能评价

8.)go along a river in a punt,esp for pleasure乘方头平底船沿河航行(尤指游览).

9.Changing trains with all that luggage was a real hassle.带着那么多行李换乘火车真是件麻烦事.

10.Changing train with all that luggage is a real hassle带著那麽多行李换乘火车真是件麻烦事

11.of a route or journey etc.; continuing without requiring stops or changes.指路线或者行程等;连续的,不需要停止或者换乘。

12.1 Changing trains with all that luggage was a real hassle .带著那麽多行李换乘火车真是件麻烦事.

13.Study on Bike-and-Ride System;大城市自行车与轨道交通换乘系统研究

14.Study on the Bick-and-Ride System Program after the Completion of Rail Transportation基于轨道交通建成后的自行车换乘规划

15.Simulation to Dynamic Construction Mechanical Behavior of Metro Transfer Channel by FLAC~(3D)地铁换乘通道动态施工力学行为FLAC~(3D)模拟

16.negociate with much give and take.就平等交换进行谈判。

17.Discussion on transfer mode and passenger transport organization at superposed transfer station;叠式换乘站换乘方式及客流组织探讨

18.Study on Park-and-Ride Selection Behaviors during Large Special Events based on Travel Time基于出行时长的大型活动停车换乘选择行为研究

相关短句/例句

parallel transfer station平行换乘车站

1.Introduced hereby are the features of soil pressure outside the foundation pit and the wall deformation during construction of the station after theparallel transfer station for the rail transit system.介绍轨道交通平行换乘车站后建车站施工中的基坑外土压力特征及墙体变形性状。

3)walking transfer步行换乘

1.For the issue of the research of finding an optimal public transit route,this paper increased considering factors such aswalking transfer in reasonable regional and grading of stops and routes emphatically.针对目前城市公交出行最优路线研究存在的问题,重点增加了对合理区域内步行换乘和站点、路线的等级划分等因素的考虑。

4)bike-and-ride自行车换乘

1.The combination of bicycle and metro is the main form ofbike-and-ride, which contains two types: bicycle acts as the access mode of the metro, and as the egress mode.自行车换乘轨道交通是符合我国城市交通发展的,但是国内很多轨道站点的自行车停车场规划与建设滞后,一些城市对自行车与轨道交通的衔接不够重视,导致了轨道交通的客运分担率长期以来处于较低的水平。

5)Bike-and-Ride(B&R)自行车存车换乘

6)walking time of transfer换乘走行时间

延伸阅读

乘客平均换乘系数衡量乘客直达程度的指标,其值为乘车出行人次与换乘人次之和除以乘车出行人次。

本内容不代表本网观点和政治立场,如有侵犯你的权益请联系我们处理。
网友评论
网友评论仅供其表达个人看法,并不表明网站立场。