100字范文 > 工程全寿命费用 engineering life cycle cost英语短句 例句大全

工程全寿命费用 engineering life cycle cost英语短句 例句大全

时间:2020-10-17 21:36:24

相关推荐

工程全寿命费用 engineering life cycle cost英语短句 例句大全

工程全寿命费用,engineering life cycle cost

1)engineering life cycle cost工程全寿命费用

2)life cycle costs全寿命费用

1.<Abstrcat>Based on the difference of the combat ability of equipments and the influence of life cycle phase on the combat ability of equipments, the system dynamics model on macroscopical control analysis of thelife cycle costs of equipments is set up, which describes the relations between all the phases of the weapons life cycle objectively and soundly.以武器装备作战能力差距为牵引,以全寿命周期阶段对作战能力的影响为主要依据,建立了基于系统动力学的武器装备全寿命费用控制分析模型,客观、合理地描述了全寿命周期各阶段之间的相互影响,并对武器装备全寿命费用宏观费用控制问题进行了仿真实验分析。

英文短句/例句

1.Cost Control of Country Road Based on Life Cycle Cost基于全寿命费用的农村公路造价控制

2.The Universities Engineering Application the Life Cycle Cost Analysis Method Research;高校工程应用全寿命费用分析方法研究

3.Research on the Application of Life-cycle Costing Analysis Method in Construction Project;工程项目应用全寿命费用分析方法研究

4.The analysis of life cycle cost on military aero-remanufacturing-engine军用航空再制造发动机全寿命费用分析

5.Life Cycle Cost (LCC)Analysises and Study of Management Methods of Weapon Equipmaents武器装备全寿命费用分析及管理措施研究

6.Make a Life Cycle Cost Analysis to Improve Radar Equipment Design and Support开展全寿命费用分析搞好雷达装备设计与保障

7.Research of Performance Based Design Method for the Minimum Life-Cycle Cost of Structures;基于性能的结构全寿命费用最小设计方法研究

8.An Optimum Management Method for Weapon Equipment System Based on Life Cycle Analysis;依赖于全寿命费用分析的武器装备体系管理优化方法

9.The Application of Neural Networks on Life Cycle Cost Analysis of Multi-ribbed Wall Structure密肋壁板结构工程项目全寿命费用分析方法研究

10.On Military Vehicles Life Cycle Cost Model Based on the Fuzzy Dynamic Analytic Hierarchy Process基于模糊动态层次分析法的军车全寿命费用模型

11.Life Cycle Cost Analysis of the Large Weapon Equipments;大型武器装备的全寿命周期费用分析

12.FLOWGRAPH ANALYSIS METHOD OF LIFE CYCLE COST FOR THE COMMERCIAL AIRCRAFT民用飞机全寿命周期费用的流图分析方法

13.On application of full life-span cycle cost theory in architectural projects全寿命周期费用理论在建设工程中的应用

14.Evaluation of Structure Life-cycle Cost Based on Non-probabilistic Methods;基于非概率方法的结构全寿命总费用评估

15.Research in Investment Decision Based on the Life-cycle Cost of Energy Efficient Residential Buildings;基于全寿命周期费用的节能住宅投资决策研究

16.Research on Cost Model of Electrical Equipment Based On Life Cycle Cost;基于全寿命周期分析的电力设备费用模型

17.Selection of duct system based on life cycle cost analysis基于全寿命周期费用分析法的风管系统的选择

18.Construction of the Analysis and Evaluation System of Life Cycle Cost of the Medical Equipment in Hospital医疗设备全寿命周期费用分析评价体系的构建

相关短句/例句

life cycle costs全寿命费用

1.<Abstrcat>Based on the difference of the combat ability of equipments and the influence of life cycle phase on the combat ability of equipments, the system dynamics model on macroscopical control analysis of thelife cycle costs of equipments is set up, which describes the relations between all the phases of the weapons life cycle objectively and soundly.以武器装备作战能力差距为牵引,以全寿命周期阶段对作战能力的影响为主要依据,建立了基于系统动力学的武器装备全寿命费用控制分析模型,客观、合理地描述了全寿命周期各阶段之间的相互影响,并对武器装备全寿命费用宏观费用控制问题进行了仿真实验分析。

3)life cycle cost全寿命费用

1.Qualitative estimation method of equipmentlife cycle cost based on unascertained number theory;基于未确知数理论的装备全寿命费用定性估算方法

2.It can be also called proportion of effectiveness andlife cycle cost as value.按照杜佩(Dupuy)的方法,把武器装备的效能转化为“战斗效能值”(OLI),又计算出了武器装备的全寿命费用,然后将2者加以对比,获得效能—费用的最佳组合,同时提出了选择武器装备系统的定量分析方法。

3.A family equations for estimating aircraft Life Cycle Cost (ALCC) is made in this thesis.本文建立了飞机全寿命费用预测参数模型系(A Family Parametric Equations For Estimating Aircraft Cycle Cost)。

4)LCC全寿命费用

1.The life-cycle-costing anaysis method(LCCA) is effective research method for project s making decision, control price and planning cost by analysis on the whole life circle with systematic thought.全寿命费用分析方法(LCCA)应用系统思想对建设项目全寿命周期的费用进行分析研究,是项目方案决策、费用监控和费用规划的一种有效分析方法,对于节约建设投资、减少建设项目全寿命周期成本具有重要意义。

2.The Life-Cycle-Cost Analysis method (LCCA) based on the technical economics and the value engineering theory, application system thought, conducts the analysis research theLCC of the construction items.全寿命费用分析(LCCA)方法是基于工程经济学和价值工程理论,应用系统思想对建设项目全寿命周期的费用进行分析研究,是项目方案决策、费用监控和费用规划的一种有效分析方法。

5)life-circle cost全寿命周期费用

1.In order to change people s traditional economical view and the values bias that green buildings are costly,the composition of green building slife-circle cost and its economic and technical evaluation index system is studied in this paper.研究了建筑全寿命周期费用的组成及绿色建筑经济技术评价指标体系,从全寿命周期费用的角度来考察绿色建筑的经济效益,改变人们用传统的经济观和价值观对绿色建筑"高成本"的片面认识,使开发和保护绿色建筑成为人们的自觉行动。

2.By weighing synthetically the two factors which are testability of system andlife-circle cost of equipment,we determine the system level testability index of complicated equipment is determined on the basis of maximum availability and minimumlife-circle cost.通过综合权衡系统可用度和装备全寿命周期费用这两方面因素,以系统可用度最大、装备全寿命周期费用最小为评价目标来确定复杂装备系统级测试性指标;建立了系统可用度和装备全寿命周期费用的数学模型,并通过合理的假设,将双函数的最值优化问题转化为在不等式约束条件下的单函数最值优化问题,最终得到了确定系统级测试性指标的数学模型;最后,通过一个实例,采用遗传算法并借助MATLAB软件平台完成了对数学模型的求解,验证了该方法的可行性。

6)life-cycle cost全寿命周期费用

1.Selection andlife-cycle cost analysis ofwater chillers for Nanjing Metro;南京地铁冷水机组选择与全寿命周期费用分析

2.The current pricing model used by our army follows the pricing criteria of "military approach to price management", and there are some defects, for example, the existence of "cost-black hole", many times calculation of the profit, not considering thelife-cycle cost, the lack of incentives, and the mechanical pricing time and so on, it is urgently needed to重点分析当前《军品价格管理办法》中规定的定价模式,指出当前定价模式存在“成本黑洞”,利润重复计算,不考虑全寿命周期费用,缺乏激励,审价、定价时机机械等问题,急需进行完善。

延伸阅读

建筑全寿命费用建筑全寿命费用建筑全寿命费用评价建筑技术方案经济效果的指标。初始投资和建筑物运行过程中的经常维修费用都反映了人力、物力、财力的消费。因此,在收益基本相同的条件下,应该通过计算建筑技术方案的全寿命费用,来评价技术方案的经济性。房屋建筑和构筑物的全寿命,是指从勘察、设计、施工、建成后使用至报废拆除这一全过程。全寿命费用由以下几项组成:①初始建设费,包括土地开发费、勘察设计费、工程建造费等。②使用期维持费,包括房屋建筑、构筑物、设备的日常维修管理所支出的人工费、材料费、保险费和税金等。③拆除费,包括用于拆除工程的设计、发包、监督、检查等扣除工程残值的费用余额。全寿命费用一般采用的计算方法有:①现值比较法尸2一尸+D·(1+i)”一1i(1+i)”L.下华份: 吸卜l)”式中,尸:表示建筑技术方案的现值总额;尸表示初始投资;D表示年经营维修费;i表示基准折现利率;n表示工程项目的寿命(年);L表示工程残值余额。②年成本法C一D+尸·(l十i)·产(1+i),一l一L.一-冬,,又1十z)“一1式中,C表示建筑技术方案的年成本额。其余符号定义同上式。对于公共建筑、公用工程和社会福利性质工程(例如公路、铁路、桥梁、办公楼、非商品化的住宅等)的技术方案,决策时主要应考虑国民经济效果和社会效果。在计算费用时,除考虑工程本身外,还须扩大到与本方案相关的部门。例如,铁路建设的费用除初始投资和维持费外,还应包括占用农田的损失费用;对社会、环境、生态等方面的影响,也应做出定性论证。